The set of an TVD sections that constitute a partial route should become an independent object for use by one or more route release objects.
Partial routes are used for for transit souple in France and Teilfahrstraßenauflösung in Germany.
Partial Routes can be used, i.e. shared, by more than one route in terms of data modelling.
As such, Partial Routes can be regarded as immaterial assets.
|
|
|
|
Re: Partial Route [message #2007 is a reply to message #2006] |
Wed, 07 November 2018 05:17 |
Joerg von Lingen
Messages: 149 Registered: May 2011
|
Senior Member |
|
|
Dear Fabiana,
the path of a route is defined by start and end plus the position of facing points. This equals the concept of
geographic interlocking. The TVD sections composing the route shall be derived from the topology.
There was also the idea of having an element ControlTable in interlocking to gather the information in tabular style.
However, this was deemed not really necessary and being a redundancy to the existing way to define routes. Thus it was
not yet further developed in the schema.
Best Jörg.
Interlocking coordinator
Fabiana Diotallevi wrote on 05.11.2018 17:08:
> Hi,
> I would like to bring this topic up because I have some
> questions about the partial routes.
> As far I understood, if the interlocking releases each
> individual tvd section after use, the release group of the
> knowsRoute can be omitted.
> However, in this case, there would be no information about
> the tvd sections that compose the route.
> On the other hand, one could avoid this by defining a
> partial route for each tvd Section (as done in the
> simpleExample), but in this way the information would be
> redundant.
>
> I was wondering whether it makes sense to reference direclty
> the tvD sections that compose the route as an alternative to
> the partial routes.
>
> What do you think about that?
>
> Regards,
>
> Fabiana
>
|
|
|
|
Re: Partial Route [message #2013 is a reply to message #2007] |
Sat, 17 November 2018 06:23 |
Joerg von Lingen
Messages: 149 Registered: May 2011
|
Senior Member |
|
|
Hi,
in comparison to railML2.3nor the list of TVD sections in the route path seems
to be considered in addition to the path definition by point positions. They
intend to use a similar model with releaseGroups.
Thus the question arise whether to mandatorily have the partialRoutes as
realeaseGroups in each route although each single section is released on its own.
Best regards,
Joerg v. Lingen
Interlocking Coordinator
On 07.11.2018 05:17, Joerg von Lingen wrote:
> Dear Fabiana,
>
> the path of a route is defined by start and end plus the position of facing points. This equals the concept of
> geographic interlocking. The TVD sections composing the route shall be derived from the topology.
> There was also the idea of having an element ControlTable in interlocking to gather the information in tabular style.
> However, this was deemed not really necessary and being a redundancy to the existing way to define routes. Thus it was
> not yet further developed in the schema.
>
> Best Jörg.
> Interlocking coordinator
>
> Fabiana Diotallevi wrote on 05.11.2018 17:08:
>> Hi,
>> I would like to bring this topic up because I have some
>> questions about the partial routes.
>> As far I understood, if the interlocking releases each
>> individual tvd section after use, the release group of the
>> knowsRoute can be omitted.
>> However, in this case, there would be no information about
>> the tvd sections that compose the route.
>> On the other hand, one could avoid this by defining a
>> partial route for each tvd Section (as done in the
>> simpleExample), but in this way the information would be
>> redundant.
>>
>> I was wondering whether it makes sense to reference direclty
>> the tvD sections that compose the route as an alternative to
>> the partial routes.
>>
>> What do you think about that?
>>
>> Regards,
>>
>> Fabiana
>>
|
|
|
|
Re: Partial Route [message #2023 is a reply to message #2017] |
Mon, 26 November 2018 06:14 |
Joerg von Lingen
Messages: 149 Registered: May 2011
|
Senior Member |
|
|
Dear Fabiana,
I have checked your proposal concerning <hasTvdSection> with the Norwegian model and the practise I knew from Thales.
Thus I have inserted this additional element into routes and overlap as optional, i.e. it is optional by the schema but
can be set mandatory by the use case. At least in IMED I have set it to mandatory.
The changes can be found in SVN trunk of railML3.
Regards,
Jörg v.Lingen - Interlocking coordinator
Fabiana Diotallevi wrote on 20.11.2018 11:41:
> Dear Joerg,
> it is true that the TVD sections composing the route could
> be derived from the topology: however, this would involve a
> quite complicated process, because it would mean to locate
> the starting and the end signal in the interlocking schema
> (and the switches too), find their referenced signals (and
> switches) in the infrastructure schema, find the netelements
> they belong to, link them to the trainDetectionElements and
> finally to the trackCircuits.
>
> Maybe it would be easier to add to <knowsRoute> a new
> mandatory tag <hasTvdSection> which lists all the
> TrackCircuits, and to leave the <hasReleaseGroup> tag
> optional (as it is today).
>
> What do you think?
>
> Regards,
>
> Fabiana
>
|
|
|