Home » railML newsgroups » railML.infrastructure » [railML3] Need for modelling Lineside Electronic Unit (LEU is needed for ETCS Level1)
Re: [railML3] Need for modelling Lineside Electronic Unit [message #3318 is a reply to message #3249] Mon, 09 September 2024 11:30 Go to previous messageGo to previous message
christian.rahmig is currently offline  christian.rahmig
Messages: 465
Registered: January 2016
Senior Member
Dear all,

christian.rahmig wrote on Thu, 06 June 2024 10:52

1) An infrastructure element for the LEU is needed.
2) A LEU should be able to connect with one or more signals.
3) A LEU should be able to connect with one or more balise groups.
4) A LEU should be able to connect with one or more balises.
5) A LEU should be able to connect with one or more euroloops.
6) The signal aspects to be evaluated by the LEU should be provided.
7) For each signal aspect to be evaluated by the LEU, the relevant route should be provided
* target signal of the movement authority
* required position of passed switches
* signals between start and target signal of the route (optional)
based on the above-mentioned requirements, I propose the following modelling:

a) Introduce a new functional infrastructure element \\linesideElectronicUnitIS.
b) Define repeatable child element \\linesideElectronicUnitIS\connectedToSignal with attribute @ref to link from LEU to signal.
c) Define repeatable child element \\linesideElectronicUnitIS\connectedToBaliseGroup with attribute @ref to link from LEU to balise group.
d) Define repeatable child element \\linesideElectronicUnitIS\connectedToBalise with attribute @ref to link from LEU to (single) balise.
e) Define repeatable child element \\linesideElectronicUnitIS\connectedToEuroloop with attribute @ref to link from LEU to euroloop.
f) Introduce a new interlocking element \\linesideElectronicUnitIL with attribute @refersToIS to link \\linesideElectronicUnitIS.
g) Define repeatable child element \\linesideElectronicUnitIL\evaluatesSignalAspect
with attribute @ref to link a signal aspect that shall be evaluated by the LEU.

Is this model complete from your perspective?

Best regards
Christian


Christian Rahmig – Infrastructure scheme coordinator
railML.org (Registry of Associations: VR 5750)
Altplauen 19h; 01187 Dresden; Germany www.railML.org
 
Read Message
Read Message
Read Message
Previous Topic: [railML3] Construction of virtual signals
Next Topic: [railML3] Regular and a track of the opposite direction
Goto Forum:
  


Current Time: Wed Oct 02 12:23:22 CEST 2024