Home » railML newsgroups » railml.timetable » operatingDay
Re: operatingDay [message #650 is a reply to message #649] Thu, 25 August 2005 15:53 Go to previous messageGo to previous message
Joachim.Rubröder is currently offline  Joachim.Rubröder
Messages: 33
Registered: September 2004
Member
<br><font size=2 face="sans-serif">I agree that this is a week point if
you use this kind of description instead of bitmasks. <br>
But this is unfortunately the way, the daytypes are used within DB.<br>
<br>
It's still better than within SBB, there the 27th of December is an afterHoliday
and therefore must be a monday. ;-)</font>
<br>
<br><font size=2 face="sans-serif">The right order should be (strongest
first):</font>
<br><font size=2 face="sans-serif"><br>
1. holiday<br>
2. afterHoliday</font>
<br><font size=2 face="sans-serif">3. beforeHoliday</font>
<br><font size=2 face="sans-serif">4. afterAfterHoliday</font>
<br>
<br><font size=2 face="sans-serif">Regards,</font>
<br><font size=2 face="sans-serif">Joachim Rubröder</font>
 
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic: Correct use of arrivalDay/departureDay
Next Topic: Correct use of arrivalDay/departureDay
Goto Forum:
  


Current Time: Sun Nov 03 20:58:34 CET 2024