Infrastructure data for a train path finding tool - #2, microscopic view [message #2508] |
Wed, 29 July 2020 14:08 |
Rüdiger Ebendt
Messages: 4 Registered: July 2020
|
Junior Member |
|
|
Hi everyone,
this is again from Ruediger Ebendt, staff at the Institute of Transportation Systems, German Aerospace Center (DLR). This post addresses the same use case as in my previous post (https://www.railml.org/forum/index.php?t=msg&goto=2507), but looking at a different level.
Some of the pieces of data we need to represent in railML2.4 (for the purpose of an import interface of a train path finding tool) belong to a microscopic view on the infrastructure (maybe, some of these even belong to interlocking instead of infrastructure). These pieces of data are (original German terms in square brackets):
- train control system (i.e. ETCS, LZB): begin, block sign, end, clearing point [Zugsicherungstechnik: Anfang, Blockkennzeichen, Ende, Zugschlussstelle]
- route (including an exact description of all negotiated route elements, exclusions and of the overlap) [Fahrstraße (inkl. einer exakten Beschreibung der befahrenen Fahrwegelemente, der Ausschlüsse und des Durchrutschwegs)]
- route clearing point [Fahrstraßenzugschlussstelle]
- overhead line section [Oberleitungsschaltgruppe]
- signal clearing point [Signalzugschlussstelle]
- operational procedures (e.g. direct traffic control (DTC)) [Betriebsverfahren, z.B. Zugleitbetrieb]
Thank you very much for your help!
Kind regards
Ruediger Ebendt
[Updated on: Wed, 29 July 2020 14:14] Report message to a moderator
|
|
|