In section 2.3.2 of the timetable specifications, the operatingDay element
is described. I feel the specifications does not fully explain how the
dayTypes element should be interpreted. In particular, I don't quite
understand the priority order of the dayTypes.
1. First consider Christmas. The 25th and 26th of December are both
holidays. The 27th is both afterHoliday and afterAfterHoliday. I presume
that in this case, afterHoliday takes preference?
2. Next consider Easter. Both Good Friday (in 2005 the 25/3) and Easter
Day (27/3) are holidays. Is the 26/3 afterHoliday or beforeHoliday?